MODABLE / ARCHITECTURE INTELLIGENCE / IFC AI EDITOR
Give IFC models an understandable, reviewable workflow.
IFC offers a structured way to exchange BIM information. Modable is building toward AI assistance that can inspect model identity, propose changes and verify their effect.

THE ARCHITECTURAL CHALLENGE
The difference between reading IFC and modifying IFC
An IFC model can include element GlobalIds, geometric representations, spatial structure, property sets and relationships. Reading an IFC file and presenting geometry is a different task from writing a standards-consistent architectural change.
An AI-enabled IFC editor must trace a request to the intended elements and preserve a reliable connection between what appears in a viewer and what will be exported. Otherwise a user may see a convincing 3D result that never changed the underlying IFC.
Example: inspecting an opening before modification
For a request about a glazed opening, a robust workflow first identifies the IfcDoor or relevant opening and its relationships to the host wall. It can then expose what is known, what must be inferred and whether the requested operation is supported. Only after the user has reviewed a proposal should a native IFC write occur, followed by validation of IDs, geometry and relationships. This sequence is the intended workflow; it is not yet a generally available operation.
See a schematic before/after exampleWhat a trustworthy workflow needs to do
GlobalId references remain traceable from viewer to source
The requested native file operation is independently verified
Unsupported entities and conversions are reported rather than silently replaced
Questions architects ask
Is IFC import already available for everyone?
No. Isolated IFC-to-3D conversion has been demonstrated, but end-to-end public access is not ready.
Does a GLB conversion count as an IFC edit?
No. GLB is useful for visual review, but an IFC edit requires modifying the building information model.
Which IFC versions are supported?
Publicly supported schemas and write operations will be listed after the end-to-end integration is verified.